Educational

ISPP – New Campus

Client: International School Of Phnom Penh
Date: April 2013 – June 2015
Location: Phnom Penh

Project Objective: Supply, Installation, Testing & Commissioning of M&E Services

Scope of works:Supply, Installation, Testing & Commissioning of M&E Services:

1. Mechanical System

  • Air Conditioning: SAMSUNG VRF System 1118.1kVA & 1939.65 kVA, AHU/CDU 270kVA & 384 kVA
  • Ventilation system
  • Split AC & Split AHU
2. Electrical System
  • Data & Telephone Systems
  • MV Switch gear, Lighting, sockets
  • Public Address System
  • Security System : CCTV, Access Control, Fire Alarm
  • Power distribution System : MV Switchgear and transformers (1600KVA x 2 sets) with generators back-up (1660 kVA x 2 units)
3. Plumbing, Drainage & Fire Protection System
  • Water Supply System : Hot & Cold Water (LPG)
  • Irrigation System
  • Swimming Pool System (50 M)
  • Waste Water Treatment Plant : 45.50 M3
  • Fire Protection & Fire Suppression System
  • Drain System : Sewage & Rainwater Systems

Harrow International School Education Thailand

Client: Harrow International
Date: Jan 2011-Dec 2011
Location: Bangkok

Project Objective:Maintenance

Scope of works:HVAC,  M&E maintenance within TFM (total facilities Management) contract with PCS.


RMIT Stage 3 Development – Academic Building 2 Education Vietnam

Client: RMIT International University Vietnam
Date: Dec 2010-Apr 2012
Location: HCMC

Project Objective: Supply, Installation, Testing & Commissioning of M&E Services

Scope of works:Supply, Installation, Testing & Commissioning of M&E Services:

  • MVAC
  • Fire Fighting Services
  • Plumbing: Hot & Cold water supply and distribution, waste water
  • Electrical Distribution network (MV and LV)
  • ELV systems: CCTV, Access Control, Fire Detection System, Public Address System, Telephone and data
  • BMS

RMIT Saigon South Education Vietnam

Client: RMIT International Vietnam
Date: Feb 2009-Mar 2010
Location: Ho Chi Minh City

Project Objective:Design, Installation, Testing & Commissioning of Mechanical and Electrical Systems for a sport centre and a set of 2 buildings for student accommodation. The sport centre had to be executed in 9 months!

Scope of works:Electrical Works, HVAC, Communication & Security Systems