Industrial

Honeys Garment Factory

Client: Konoike Construction
Date: Jun 2014 – Feb 2015
Location: Yangon – Myanmar

Project Objective:
Supply, installation, testing and commissioning of Mechanical and Electrical

Scope of works:Electrical, Fire Fighting System and Fire Alarm System

  • Install 500KVA open type generator
  • MV system 1,500KVA Oil type transformer
  • LV Distribution panels
  • Lighting fixtures Indoor and outdoor
  • Power socket, phone socket, data socket
  • Data cabling, telephone cabling
  • Fire alarm system
  • PA system
  • Lightning protection system
  • Install Split Units system
  • Extractor fans
  • Drainage system
  • Sewage system
  • All sanitary wares ( Toilet bowl, Urinal bowl, wash basin, service sink)
  • Fire Hose reel, fire extinguisher

Lao Coca Cola Bottling

Client: Lao Coca- Cola Bottling Co., Ltd.
Date: Jun 2014 – Feb 2015
Location: Yangon – Myanmar

Project Objective:
Design, Supply, Installation & Testing and Commissioning

Scope of works:Transmission Line, Electrical system, Plumbing & Fire Protection system, Production Utility system and HVAC system

  • Supply and installation of 24KV Feeder from EDL power station located at 5km
  • Supply and installation of MV Switchgear, RMU consisting 1xLBS and 2xfused LBS, Generator, MV cables, Transformer, Containment system, Emergency and lighting system, PABX, Telephone and Intercom System, Access Control System, CCTV, Fire Alarm System, MVAC System, Earthing and Lightning Protection System
  • Supply and installation of VRF System for Offices, Split System, roof fan, ceiling fan, general exhaust fan
  • Supply and installation of Hot & Cold Water System, Sewage and Waste Water System, Fire Hose Reel and Hydrant System, Fire Suppression System, Fire and Water supply pumps, sewer submersible pumps.

Myanmar Coca Cola Plant

Client: Coca-Cola Pinya Beverages Myanmar (CCPBM)
Date: Feb 2014 – Nov 2014
Location: Yangon – Myanmar

Project Objective:
Supply, installation, testing and commissioning of Mechanical, Electrical and Fire Fighting system

Scope of works:Electrical, Fire Fighting System, Fire Alarm System and HVAC

  • Electrical works: LV cables, Sub-DB’s, Socket Outlet, Indoor and Outdoor lighting
  • Fire Fighting System: UL/FM Diesel Pump, Electrical Driven Pump, Jockey Pumps, Sprinkler and Hydrant System
  • Fire Alarm System: Smoke Detector, Heat detector, Module, Bell, Break Glass and FA Panel
  • HVAC: Air Conditioning units, Ventilations, AHU, Evaporator, Compressor and Refrigeration

Colgate Palmolive Factory Phase II Industrial Vietnam

Client: Colgate Palmolive
Date: Nov 2010-Jul 2011
Location: Binh Duong

Project Objective:
Supply, Installation, Testing & Commissioning of M&E Services for phase II area and warehouse

Scope of works:Supply, Installation, Testing & Commissioning of M&E Services:

  • MVAC
  • Fire Fighting Services
  • Electrical Distribution network
  • ELV systems: CCTV, Access Control, Fire Detection System, Public Address System, Telephone and data
  • BMS

Ariston Factory Vietnam

Client: Ariston Thermo Vietnam Co., Ltd
Date: Feb 2013 – Sept 2013
Location: Bac Ninh Province

Project Objective: Supply and Installation of M&E Works Package

Scope of works: Electrical Works, HVAC, Plumbing & Fire Fighting, Communication & Security Systems


ABB Factory, Bac Ninh Industrial Vietnam

Client: ABB Ltd. (Vietnam)
Date: Feb 2009-Sep 2009
Location: Bac Ninh Province

Project Objective: Supply, Installation, Testing & Commissioning for ABB new factory at Tien Son, Bac Ninh Province

Scope of works: Electrical Works, HVAC, Plumbing & Fire Fighting,Communication & Security Systems


Vietnam Sonion Industrial Vietnam

Client: Sonion A/S (Denmark) world pioneer in miniature acoustical components
Date: Apr 2006-Jul 2007
Location: Ho Chi Minh City

Project Objective: Design, Supply, Installation and Commissioning for M&E works, including clean rooms for state-of-the art 11,000 sqm high-tech production facilities.

Scope of works: Electrical Works, Air Conditioning Works & Ventilation, Plumbing & Fire Fighting, Centralized Compressed Air, Clean Rooms Assembly, Clean Room Process


TAV Garment Factory Industrial Vietnam

Client: TAV Co. Ltd – TAL Group
Date: Apr 2006-Apr 2007
Location: Thai Binh Province

Project Objective: Supply, Installation, Testing & Commissioning, M&E works for a 2 storey garment factory at Nguyen Duc Canh industrial zone.

Scope of works:Electrical Works


Cambodia Beverage Company (Coca-Cola) Industrial Cambodia

Client: Cambodia Beverage Company (subsidiary of Coca-Cola SABCO)
Date: Jul 2008-Apr 2009
Location: Phnom Penh

Project Objective: Supply, Installation, Testing & Commissioning for a new can production line and M&E works for a new PET line building

Scope of works: Electrical Works, Water Treatment Plant, Process Piping, Cooling System, Security Systems


Sotelco Data Centre Industrial Cambodia

Client: Sotelco – JV Beeline – Huotraco
Date: Oct 2008-Feb 2009
Location: Takmao

Project Objective: Design, Civil Works, Construction, Supply and Installation of security systems, main electricity supply and control, main temperature control

Scope of works:Civil Works, Design & Build, Electrical Works, HVAC, Plumbing & Fire Fighting, Communication & Security Systems


Crown Can Factory Industrial Cambodia

Client: Crown Asia Pacific Holdings Limited
Date: Jan 2007-Oct 2007
Location: Phnom Penh

Project Objective: Supply, Installation, Testing and Commissioning, Mechanical and Electrical works for a new manufacturing can facility in Cambodia. The contract has been successfully completed within 8 months

Scope of works:Electrical Works, HVAC, Plumbing and Fire Fighting


Noble Electronics and Industrial Robot Factory Industrial Vietnam

Client: VINACONEX Date: Dec 2005-May 2006 Location:Ho Chi Minh City

Project Objective: Supply, Installation, Testing & Commissioning (EPC) for production of high-tech electronic components supply for the robotic assembling industry.

Scope of works:Electrical Works, HVAC