Get In Touch
WE BUILD WHAT YOU DREAM
Client: Yangon Excelsior Hotel Co., Ltd
Location: Yangon, Myanmar
Date: February 2009 – March 2010
Project Objective: Supply, Install, Testing & Commissioning of Electrical, ELV, Fire Fighting, Plumbing & Sanitary , HVAC Systems
Scope of works:
Ground Cabling, Main Incoming Feeder, Automatic Transmission & Switch, Generator Installation (630KVA Prime Rated Genset, 3 Phase,50Hz,400V), Lightning, Surge and Earthing Protection, Main, SubMain and Secondary Distribution Boards, Cabling Cu/XLPE/PVC, Cu/PVC and Cu/FR-PVC feeder cables, Way & Conduits, Lighting Fixture
Public Address System, CCTV System, Tel & Data System, IPTV, Access Control System
Metal Duct Work with Insulation, Hydronic Piping with Insulation, Fresh Air handling Unit, VRV System , DX Unit Cooling System, Fire Damper, Volume Damper, Centrifugal In Line, Exhaust Fan & Diffuser, Propeller and Upblast Fans & Air Grille
LPG System including gas detector panel, check valve and all accessories
Fire Alarm System, NFPA Vertical Turbine Electrical Pump Fire Fighting System, Dry Riser System
Water Distribution System, Cold & Hot Water System, Sanitary Plumbing & Rain Water System, Underground Drainage System, Submersible Sewage Pump System