Dulwich International School

Client: Thanlyin Estate Development (YOMA group)

Location: Thanlyin Star City, Yangon, MYANMAR

Date: August 2015 – May 2018

Project Objective: Supply, Design, Installation, Testing and Commissioning of complete M&E works

Scope of works: 

  • Electrical Works

DB & MDB Panels Installation, Feeder Cabling & Wiring, Lighting Fixture & Lighting Control System,
Lighting Protection & Ear thing

  • Mechanical Works

VRV System, Centrifugal Fan Installation, Air Grill & Duct Works, Chimney Ventilation, Copper Piping Work

  • Plumbing

Sanitary Fixture, Cold Water System, Coring, Hot Water System ,Water Drainage System, Related Piping Work

  • Fire Fighting / Fire Alarm

Fire Suppression System, Fire Hose Reel Cabinet, Dry Riser – Wet Riser System

  • LPG System    

Seamless Steel Piping, Valve & Pressure Gauge , Gas Detector, Gas Control Panel, LPG Gas Tank Installation

  • ELV

Telephone – Data & MATV System, Data Cabling & Wiring, Fire Alarm System, CCTV , Time Distribution, Programmable
Bell & Background Music System, Access Control System