Setthathirath Laos

Client: Wakachiku Construction

Location: Vientiane, Laos

Date: 2019

Project Objective: Supply, Design, Installation, Testing & Commissioning, and Maintenance

Scope of works:           

  • Electrical Works

200 KVA AVR, 630 KVA Transformer, 200 KVA Diesel Generator, MDB and DB Panels, Electrical Services, Lightning Protection System, HDPE U/G Piping for cold water

  • Plumbing

Lift Pump, PW-1, Cap. 200L/min @ 210kPa, Copper Pipe for Hot Water System, uPVC Sewage Water System, GI Piping for Fire Hydrant, GI Piping for Hose Reel System, Electrical fire pumps Q=300 l/min, Head=500 Kpa, UL/FM Approved, NFPA-20

  • Mechanical Works

Medical air compressor system (Oil Free Reciprocating Bare Type, Duplex) fulfilling HTM 2022 / HTM 02-01 / ISO requirements (BS Standards) and NFPA 99 requirements (USA Standards).

Medical vacuum pump system (Oil Sealed Rotary Vane Type, Duplex, Complete Set) fulfilling HTM 2022 / HTM 02-01 / ISO requirements (BS Standards) and NFPA 99 requirements (USA Standards)

  • ELV

O2 Medical gas manifold system fulfilling HTM 2022 / HTM 02-01 / ISO requirements (BS Standards) and NFPA 99 requirements (USA Standards) in Oxygen Plant Room, Medical copper pipe and Fittings, Fire Alarm System, Public Address System, IP CCTV System, Nurse Call System, MATV, Communication System”

Get In Touch

WE BUILD WHAT YOU DREAM