Client: LPB Waterfall Co. Ltd
Date: February 2017 – December 2017
Project Objective: Supply, Installation, Testing & Commissioning of all the Mechanical, Electrical and Plumbing work
Scope of work
Supply and Install of Toshiba Split AC system, ducted type with heating function, Ventilation and exhaust system, piping works, duct work, diffuser, Grilles and Registers
Supply and Installation of incoming 22 kV PEA Overhead line, 22kV SF6 Insulated Switchgear System, dry type cast resin 630 kVA Transformer, Genset Prime Rating 630kVA, 400V, LV Panels and distribution, LV cabling, earthing, lightning protection
HDPE Underground cold water piping system, hose bibs, PVC Soil Water piping system, floor clean out, PVC Waste Water Piping System, Kitchen Waste Water Piping System, ventilation piping system, waste water treatment plants (19 units ranging from 1CU.M to 11 CU.M), perforated drain pipes, PPR above ground piping, raw water, filter pump, sand filters, water softener, pre chlorine tank and pump, circulate and booster pumps, Drain Piping System
Supply and Installation of Portable fire Pump with flow rate of 500 GPM, TDH 112m, portable fire extinguisher type (6A/10B) 10 LBS and CO2, Addressable Fire Alarm System, ceiling loudspeakers, control panel
Supply and installation of Guest Room Control System (RCU), Telephone and Computer cabling system