Client: Pasashok Construction
Location: Vientiane, Laos
Date: June 2021 – January 2023
Project Objective: Supply, Installation, Testing & Commissioning
Scope of works:
MDB & DB panel (200A)
Cable, Cable tray and conduit
Lighting and Industrial power outlet
Fire Alarm system.
Access control system.
Data & telephone system.
CCTV system.
AHU and VRV CDU system (131 KW), Cassette type.
Fan box high pressure system (14,000 L/s)
Roof ventilation fan.
SS/G.I ducting & Fabric duct ventilation system. Size Dia 1500mm
BMS control system.
Factory SS steel pipe drainage system. Underground SS pipe DN 300.
PPR pipe and PVC pipe.
Submersible pump.
Boiler (150L)
Sprinkler & FHC system. (1400 pcs of sprinkler head, main pipe DN 300)
Alarm checker station (5 Zone)
Vertical turbine fire pump. 2,000 GMP, 160 Psi (Diesel, Electric and jockey pump).