Crown Can Factory

Client: Crown Asia Pacific Holdings Limited

Location: Phnom Penh,  Cambodia
Date: January 2007 – October 2007
Project Objective: Supply, Installation, Testing and Commissioning, Crown (USA), worldwide leader in metal packaging technology,  entrusted Comin Khmere for the execution of the mechanical and electrical works for its new manufacturing can facility in Cambodia.

Scope of works: 

  • Electrical Works

LV switchboards, cable tray and LV cabling works, internal and external lighting system, power socket outlets, fire detection and alarm system, telephone and data cabling works, lightning protection and earthing system

  • HVAC  

Variable Refrigerant Volume (VRV) air conditioning system installed at the office area. 4 Units of makeup air installed to supply fresh air into the factory In order to pressurize the product area and prevent dust penetration    into the factory

  • Plumbing and Fire Fighting

Clean water treatment system, sanitary water distribution c/w booster pumps, soil & waste water system. NFPA firefighting system c/w 2 diesel driven fire pumps UL/FM, 2500GPM, 150PSI. Comprises with 1200 sprinkler   heads, 28 hydrants & fire hose cabinets