Myanmar Coca Cola Plant

Client: Coca-Cola Pinya Beverages Myanmar (CCPBM)
Date: February 2014 – November 2014
Location: Yangon – Myanmar

Project Objective: Supply, installation, testing and commissioning of Mechanical, Electrical and Fire Fighting system

Scope of works: Electrical, Fire Fighting System, Fire Alarm System and HVAC

  • Electrical works: LV cables, Sub-DB’s, Socket Outlet, Indoor and Outdoor lighting
  • Fire Fighting System: UL/FM Diesel Pump, Electrical Driven Pump, Jockey Pumps, Sprinkler and Hydrant System
  • Fire Alarm System: Smoke Detector, Heat detector, Module, Bell, Break Glass and FA Panel
  • HVAC: Air Conditioning units, Ventilations, AHU, Evaporator, Compressor and Refrigeration