Siem Reap International Airport

Client: Société Concessionaire de I’Aéroport (VINCI)

Location: Siem Reap, Cambodia

Date: December 2004 – August 2006

Project Objective: Design, Supply, Installation, Testing and Commissioning, Integrate functional engineering solutions with a sophisticated architectural environment and design features central to the daily terminal operations daily terminal operations

Scope of works: 

  • Electrical Works

One unit of 3×900 kVA Cummins generator synchronized with a 2×875 kVA existing unit in the power plant   

MV and LV electrical distribution (total 4450 kVA

  • HVAC

2 units of 700 kW and 1 unit of 500 kW water    cooled   chillers

  • MVAC

Supply, installation and T&C of CIAT Air-cooled Chillers, Grundfos Chilled Water pumps, Carrier Air handling Units, Carrier Fan Coil units, Pre-insulated chilled water pipes, valves, System Air Ventilation Fans, Ductworks and Air Terminals and Devices

  • Communication and Security Systems

Public address system, PABX, flight information system (FIDS), IT network

  • BMS Works

Controls and devices of MVAC System, LMCPs, Lighting Controls, Interfaces to BHS, Fire Alarm system, Pumps, Lighting, Energy meters, Pumps, Car parking system, and X-ray system

  • Plumbing, Drainage & Fire Protection

Supply, installation and T&C of Toto Sanitary fixtures, Hand dryers, Submersible pumps, Fire Hose Cabinets, and Fire Extinguishers