Sihanouk International Airport

Client: Thanlyin Estate Development (YOMA group)

Location: Thanlyin Star City, Yangon, Myanmar

Date: August 2015 – May 2018

Project Objective: Design, Supply, Installation, Testing & Commissioning of M&E Works

Scope of works: 

  • MVAC

VRV System, Centrifugal Fan Installation, Air Grill & Duct Works, Chimney Ventilation, Copper Piping Work

  • ELECTRICAL

DB & MDB Panels Installation, Feeder Cabling & Wiring, Lighting Fixture & Lighting Control System,  Lighting Protection & Ear thing

  • ELV

Telephone – Data & MATV System, Data Cabling & Wiring, Fire Alarm System, CCTV, Time Distribution, Programmable Bell & Background Music System, Access Control System

  • Plumbing & Sanitary

Sanitary Fixture, Cold Water System, Coring, Hot Water System, Water Drainage System, Related Piping Work

  • Fire Fighting

Fire Suppression System, Fire Hose Reel Cabinet, Dry Riser – Wet Riser System

  • LPG System

Seamless Steel Piping, Valve & Pressure Gauge, Gas Detector, Gas Control Panel, LPG Gas Tank Installation

Get In Touch

WE BUILD WHAT YOU DREAM