Client: Lao Coca-Cola Bottling Co., Ltd.
Location: Vientiane, Laos
Date: June 2014 – February 2015
Project Objective: Design, Supply, Installation & Testing and Commissioning
Scope of works:
Supply and installation of 24KV Feeder from EDL power station located at 5km from the site including poles, cabling, switches, arrestors.
Supply and installation of MV Switchgear, RMU consisting 1xLBS and 2xfused LBS, Generator, MV cables, Transformer, Containment system, Emergency and lighting system, PABX, Telephone and Intercom System, Access Control System, CCTV, Fire Alarm System, MVAC System, Earthing and Lightning Protection System
Supply and installation of VRF System for Offices, Split System, roof fan, ceiling fan, general exhaust fan
Supply and installation of Hot & Cold Water System, Sewage and Waste Water System, Fire Hose Reel and Hydrant System, Fire Suppression System, Fire and Water supply pumps, sewer submersible pumps.
Supply and installation of Stainless Pipe Sch. 40, Type 304L piping network for Compressed Air System, Black Steel Pipe Schedule 40, Seamless piping network for Steam Line and Fuel system, Stainless Pipe Sch. 40, Type 304L piping network for Chilled Water, Production Drainage System using uPVC Pipe and HDPE pipe, Stainless Pipe Sch. 40, Dairy piping network for R.O and Soft water and C.O .2 System